Skip to main content
Penticton Regional Hospital Main Entrance

Penticton Regional HOSPITAL—Patient Care Tower

  • 6,000 lighting fixtures
  • 11 electrical rooms
  • 13 communication rooms

Projects / Institutional

Project info

The Patient Care Tower at the Penticton Regional Hospital is a new 281,530 square-foot, seven-storey patient care tower and parkade connected to the existing campus buildings via links on the new tower’s first three levels. 

Designed and constructed to achieve LEED® Gold Certification, the tower includes an ambulatory care centre, surgical services centre, 84 medical/surgical inpatient beds in single patient rooms, a new medical device reprocessing unit, rooftop helipad, 480 new parking stalls, and space for the UBC Faculty of Medicine program.

We delivered electrical, lighting, healthcare technology, information management information technology (IMIT), and structured cabling solutions for this project. The IMIT components included authority network deployment, BMS network deployment, authority telephony deployment and upgrade, authority wireless network, nurse call, wireless staff communication, public address, video door intercom system, access control, panic alarm and panic stations, CCTV, and patient wandering.

Details

  • Sector: Institutional
  • Completion: 2019
  • Owner: Interior Health
  • Contractor: EllisDon
  • Award: 2019 VRCA Awards of Excellence — Silver Winner

Awards for this project

Royal Columbian Hospital Construction Site

Royal Columbian Hospital Redevelopment

  • 950,000 Square Feet
  • 350 Beds
  • 10 Storeys

Projects / Institutional

Project info

Royal Columbian Hospital provides critical care to more than a third of British Columbians. The hospital is one of only three regional hospitals in the Fraser Health region that offers primary, secondary, and tertiary services, and is the only hospital in the province with cardiac, trauma, neurosciences, high-risk maternity, and neonatal intensive care all on one site. 

The hospital is undergoing a three-phase redevelopment that will enhance its ability to prove lifesaving care. With elevated patient-centered care, new advanced medical technologies, updated buildings, and an increased bed capacity of 50 percent, Royal Columbian Hospital will be ready to address the recent increase in patient volumes. 

We’re currently involved with Phase Two of the Royal Columbian Hospital Redevelopment Project, which includes transforming the hospital campus to make way for a new 10 storey state-of-the-art Acute Care Tower. 

The new tower includes:

  • Emergency Department with 75 Treatment Rooms
  • Surgical Interventional Department 27 Operating/Interventional Rooms
  • Critical/Intensive Care Unit (60 Beds)
  • Maternity (28 Beds)
  • Neonatal Care Unit (24 Beds)
  • 5 Levels of Medical Surgical Inpatient Rooms
  • Roof-top Heliport
  • Medical Device Reprocessing
  • Support Services
  • 2 Levels of Underground Parking

We’re providing electrical construction, fibre optics, and structured cabling services to build the hospital’s new Acute Care Tower. To enable construction, a temporary support building is being installed along with the completion of the Phase One Energy Centre and Campus Communication Hub that includes:

  • 12.47 kV Utility Service
  • Two 3000 kW Generators
  • Two High Voltage Transfer Switches
  • High Voltage Distribution
  • Two 550kW UPS Systems

Details

  • Sector: Institutional
  • Completion: 2025
  • Owner: Fraser Health
  • Contractor: EllisDon

project Solutions

Lions Gate Hospital Redevelopment Paul Myers Tower

Lions Gate Hospital Redevelopment

  • 259,500 Square Feet
  • 108 Patient Beds
  • 6 Storeys

Projects / Institutional

Project info

Lions Gate Hospital has been an integral part of Greater Vancouver for almost 80 years. It serves residents across the Vancouver Coastal Health region and surrounding communities, however it was due for a redevelopment.

The new, state-of-the-art, high-tech acute care facility will replace the currently aging building and will be one of the most technologically advanced healthcare facilities in BC. Its patient-centered design will improve the experiences for patients and their families with more access to daylight, views of nature, and quiet spaces.

There will be 108 patient beds in 84 single rooms and 12 semi-private double rooms that can be separated by a sliding door. All 108 patient beds, including those in semi-private rooms, will have their own private en-suite washroom.

We are providing a full electrical and technology scope to the redevelopment, including main electrical construction, lighting, healthcare technology, security systems, and structured cabling.

Details

  • Sector: Institutional
  • Completion: 2025
  • Owner: Vancouver Coastal Health
  • Contractor: PCL Constructors Westcoast Inc.
Mills Memorial Hospital

Ksyen Regional Hospital

  • 340,000 Square Feet
  • 78 Bed Facility

Projects / Institutional

Project info

Mills Memorial Hospital was an essential part of the Terrace community and had provided healthcare to the surrounding Northern BC region for decades. The original hospital opened in 1961 and has undergone upgrades and renovations over the years. Despite these improvements, the hospital needed to be replaced to meet the long-term requirements of the community and region.

Completed in 2024, the Ksyen Regional Hospital, formerly called Mills Memorial Hospital Redevelopment project, is a 78-bed facility. It now serves as a regional center for trauma services, orthopedic surgeries, pathology, radiology, clinical support, and pharmacy services. In addition to the main hospital, a separate mental health facility, the Seven Sisters, was simultaneously built. This 10,000-square-foot, 25-bed facility adjacent to Ksyen offers long-term rehabilitation and recovery programs for adults living with serious and persistent mental illness.

Our Scope

Leveraging our multi-disciplinary teams, we delivered electrical and technology solutions for this project. These include electrical, lighting, security, audio-visual, and structured cabling. In total, our teams installed over 800,000 feet of conduit, 3.5 million feet of wire, and 1.75 million feet of structured cabling.

Highlights from the project include a 25KV power distribution system down to panelboards, emergency generators, Uninterruptible Power Supply (UPS), lighting and lighting controls, and fire alarms.

Our technology solutions include structured cabling, intrusion detection, wired duress, Real-Time Locating System (RTLS), wireless duress, video surveillance, nurse call, access control, and infant abduction systems — all integrated through a single-pane platform that allows us to manage all the technology systems from one dashboard.

Thanks to the team’s hard work, dedication, and innovative thinking, the project was completed one month ahead of the substantial completion date.

Details

  • Sector: Institutional
  • Completion: 2024
  • Owner: Northern Health
  • Contractor: PCL Construction
  • Award: 2025 NRCA Award – Electrical Contractor of the Year Over $2 Million