Skip to main content
Harry Jerome Community Recreation Centre Exterior Entrance

Harry Jerome Community Recreation Centre

  • 18,500 Square Meters

Projects / Institutional

Project info

The new Harry Jerome Community Recreation Centre (HJCRC) is under construction in North Vancouver, BC. Embracing the City’s vision of A Healthy City for All, the new centre will ensure that the North Shore population has access to recreation facilities and activities that focus on physical and mental wellness, inclusion, accessibility, and diversity.

As the City’s largest-ever capital program, replacement of the current 56-year-old HJCRC includes an arena with seating for 500 spectators, expanded aquatic space, indoor and outdoor fitness areas, multipurpose rooms, preschool and youth spaces, a skate park, and a new facility for the Silver Harbour Senior’s Activity Centre.

Sustainability and accessibility are at the core of this design. The new facility aims to produce 40% less CO2 emissions than the existing centre and will be seamlessly connected to the Lonsdale Energy Corporation’s district energy system. Moreover, the new HJCRC is actively pursuing gold certification from the Rick Hansen Foundation. Key accessibility features include sensory-friendly washrooms, multiple accessible entrances to the pool, an inclusive community kitchen and more.

We are leading the electrical, structured cabling, and security scopes of the project. This includes lighting and lighting controls, fire alarm, video surveillance, access control, public address, and rough-in for communications systems and EV chargers.

In collaboration with the other trades on-site, we are contributing to a BIM model that integrates all building elements. This allows us to identify clashes and solve conflicts prior to construction in the field. Once completed, the model will serve as a valuable resource for future maintenance and renovation work.

Details

  • Sector: Institutional
  • Completion: 2025
  • Owner: City of North Vancouver
  • Contractor: Smith Bros & Wilson
EV Charger at Lewis Centre

Mid-Island EV Network

  • 28 EV Stations Installed
  • 15 Communities

Projects / Institutional

Project info

This collaborative multi-year project, organized between Mid-Island communities, is building a Level 2 charging network across Central Vancouver Island. This initiative was developed in support of BC’s Clean Transportation goal of reducing carbon emissions.

In addition to addressing environmental concerns, this venture will also increase tourism by EV drivers to the region, ease the transition to EV’s for local residents, and support economic development.

The EV chargers are located in nine districts between Nanaimo and Tofino: 6th Street Courtenay, Bowen, Comox Community Centre, Cumberland Cultural Centre, Lantzville, Lewis Centre, Nanaimo City Hall, Oliver Woods, and Small Craft Harbour Tofino.

We provided turn-key solutions to install 27 dual-head and one single-head Level 2 EV charging equipment. This included all electrical wiring, trenching, testing, configuration, and commissioning.

Details

project Solutions

Maillardville Community Centre Building Exterior

Maillardville Community Centre

  • 22,000 Square Foot Facility
  • 560 Square Foot Gymnasium
  • 3 Storeys

Projects / Institutional

Project info

For 40 years, the original centre acted as a cornerstone for the Maillardville neighbourhood. As time passed, the aging facility could no longer support the needs of a growing community. The City of Coquitlam decided it was time for a new community centre to replace the previous neighbourhood house.

Completed in the Fall of 2022, the new 22,000 square foot facility doubles the size of the previous community centre and features the City’s first ever dedicated gym. The centre features modern amenities include a teaching kitchen, a combined youth and seniors lounge, a kid-centric space, a studio fitness space, and more. These new diverse offerings and programs will allow the facility to serve more families.

We performed the electrical, structured cabling, and AV scope of work for this project. This included installing the electrical distribution equipment, lighting and lighting control, inverters and AV equipment. Through the planning prepared by our PPS team, and thorough coordination on site, we were able to foresee potential obstacles and plan accordingly to deliver a successful project.

Details

  • Sector: Institutional
  • Completion: 2022
  • Owner: City of Coquitlam
  • Contractor: Ledcor Construction Ltd.

project Solutions

Clayton Community Centre Exterior

CLayton Community centre

  • 1,801 Light Fixtures
  • 52 Cameras
  • 63 Card Readers

Projects / Institutional

Project info

Clayton Community Centre has been an incredible addition to community life in Surrey, BC. With music and recording studios, a rehearsal hall, gymnasium, fitness centre, and library, this unique facility was created to promote arts and culture in the community. At completion, this impressive building was the first community centre to achieve Passive House certification in North America, and is Canada’s largest Passive House facility to date. 

With the goal of reducing the building’s carbon footprint and meeting the high performance and comfort levels of the Passive House standard, this sustainable new build project was an exciting opportunity for us to use a wide range of our skills and services. We took on the main electrical scope as well as a full technology scope, including fire alarm and battery backup, lighting, security, structured cabling, and audio visual components. 

For lighting, we installed 1,801 light fixtures including 63 7’x7’x7′ triangle LED lights designed to simulate daylight. Our security scope included access control, intrusion, code blue, and video management system. We installed shielded CAT6a to future-proof the building for increased network speeds, along with a DAS system for emergency response. For audio visual, we installed user device-friendly interfaces and digital reservation displays for each room and high-end speakers throughout the premise.

Details

  • Sector: Commercial
  • Completion: 2020
  • Owner: City of Surrey
  • Contractor: EllisDon
  • Award: 2021 VRCA Awards of Excellence — Silver Winner

Awards for this project